PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing steel columns at Derrick -3 (2nd Floor) Facing South-West (800x600).jpg Safety cables and poles at Derrick -2 (2nd Floor) Facing North (800x600).jpg Safety cables and poles at Derrick -2 (2nd Floor) Facing South (800x600).jpg Temporary Electrical panel at Elev. 1,2,3 Facing South (800x600).jpg Underground Storm sewer Facing North (800x600).jpg Excavating for the underground sanitary Sewer Facing West (800x600).jpg Installing PVC pipe for temporary power Facing North (800x600).jpg Underground sewer Facing South (800x600).jpg
Previous pageNext page Underground Storm sewer Facing North (800x600)
Underground Storm sewer Facing North (800x600)